CHECKSHEET
Checksheet Status Board

Dashboard / CM / NSW LEAK TEST / YFG00 / Checksheet #2145

Live
Total parameters6checked
Live5within limits
NG1out of limits
83%
Live %5 of 6 parameters

Checksheet

Result #2145 · NSW LEAK TEST · YFG00
Approved by Site Admin · 19 Dec 18:56
OK
Done by
Site Admin
When
19 Dec 2023, 18:4619 Dec 2023
Parameters
5 OK · 1 NG of 6
Every parameter in this record
#ParameterSpecificationTechniqueActualLimits (LSL – USL)Result
10 Fin Height 5.62±0.05MM Manual Entry 5.62 — OK
11 Tank to Tank 629.6±1.5MM Manual Entry 629.6 — OK
12 Header to Fin Gap Less Than 5MM Manual Entry 4.5 — OK
13 Fin Condition Fin Straight/No lean Visual — — OK
14 HDR CLAMP Condition OK Condition Visual — — NG
15 Wrap UP sensor OK Condition Visual — — OK