CHECKSHEET
Checksheet Status Board

Dashboard / CM / NSW LEAK TEST / YFG00 / Checksheet #2051

Live
Total parameters3checked
Live3within limits
NG0no failures
100%
Live %3 of 3 parameters

Checksheet

Result #2051 · NSW LEAK TEST · YFG00
Approved by Site Admin · 15 Dec 10:46
OK
Done by
Site Admin
When
15 Dec 2023, 10:3615 Dec 2023
Parameters
3 OK · 0 NG of 3
Every parameter in this record
#ParameterSpecificationTechniqueActualLimits (LSL – USL)Result
10 Fin Height 5.62±0.05MM Manual Entry 5.62 — OK
11 Tank to Tank 629.6±1.5MM Manual Entry 629 — OK
12 Header to Fin Gap Less Than 5MM Manual Entry 4.5 — OK